Basic Information
- Material: Copper,lead,zinc ore
- Capacity: 2000t/d
- Methods: Leaching
The project taps into high-grade copper deposits, ensuring superior output quality that meets international standards.
This project employs cutting-edge equipment and proven technologies to guarantee smooth and efficient project operations.
The technical staff is capable of identifying issues with the existing equipment and devising targeted strategies for the modernization of outdated production lines. Consequently, the new production line boasts enhanced efficiency and increased capacity.
Alongside 7*24 online assistance, SBM maintains overseas offices in the vicinity to offer prompt and attentive services at all times.